Fresh News Trade Market
Advertisement
  • Politics
  • Business
  • Stocks
  • Investing
No Result
View All Result
  • Politics
  • Business
  • Stocks
  • Investing
No Result
View All Result
Fresh News Trade Market
No Result
View All Result
Home Investing

Munda Gold Mine Mining Progresses: First Blast

admin by admin
June 19, 2025
in Investing
0
Munda Gold Mine Mining Progresses: First Blast
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an update on mining of the Starter Pit at the Munda Gold Mine, 5km from Widgiemooltha, Western Australia.

Highlights

  • First blast 17 June 2025.
  • Mining is well underway in Starter Pit.
  • Approximately 70,000 BCM mined in first month.
  • Largely free-dig to date.
  • Site preparation for Waste Dump and ROM pads completed.
Management Comment

Managing Director, Mark English, said:

“It’s a momentous time in our progression and development of the Company, we are delighted.

“Mining is in full swing and all activities are progressing as we expected. Nothing is holding us back. We are achieving our targets and are exactly where we expected to be in the mine development.

“We are pleased to be monetising our major asset in such a bullish gold market, the timing is excellent. It is a great place to be as an unhedged gold producer,” said Mr English.

Approximately 70,000 BCM (Bank Cubic Metres) of material have been mined at Munda over the first 4 weeks of operations from a pit design encapsulating 380,000 BCM. Mining to this stage has been largely free-dig with the first blast completed 17 June 2025.

Auric personnel are utilising a dry hire fleet comprising a 125t excavator and four 40t articulated ‘Moxi’ dump trucks together with relevant ancillary equipment.

Both RC grade control and blast hole drilling, together with blast supervision is managed by Kalgoorlie-based Total Drilling Services Pty Ltd.

The Company has estimated that approximately 125,000 tonnes of ore will be extracted from the Starter Pit at a grade of 1.8g/t Au1. Most of that ore will be mined toward the base of the Starter Pit, during the last two months of operations. The Starter Pit is scheduled for completion in October.

Munda has an estimated resource of 145,000 ounces of gold at a 0.5g/t cut-off2. Once the Starter Pit is finished Auric expects to complete detailed planning for a larger pit, to commence in 2026.

The Company is fully funded to mine the Starter Pit at Munda from the proceeds of gold sales from the Jeffreys Find Gold Mine near Norseman.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

Brunswick Exploration

Next Post

Graphite Processing Expansion Opportunities

admin

admin

Next Post
Graphite Processing Expansion Opportunities

Graphite Processing Expansion Opportunities

    Become a VIP member by signing up for our newsletter. Enjoy exclusive content, early access to sales, and special offers just for you! As a VIP, you'll receive personalized updates, loyalty rewards, and invitations to private events. Elevate your experience and join our exclusive community today!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    • Trending
    • Comments
    • Latest

    DP Trading Room: Spotlight on Mega-Cap Earnings

    July 29, 2024

    The Last Guardian Playstation 4 Game review

    June 26, 2024
    Missed the Gilead Surge? Here’s What You Need to Know About the Big Move

    Missed the Gilead Surge? Here’s What You Need to Know About the Big Move

    July 30, 2024

    Explore Morocco’s Desert and Seaside With These Stunning 35mm Images

    May 31, 2024
    Terra Clean Energy

    Terra Clean Energy

    0

    Yamaha 2017 MotoGP bike launched with Rossi and Vinales

    0

    Sony shares a list of 39 titles that will be optimized for the PS4 Pro at launch

    0

    Explore Morocco’s Desert and Seaside With These Stunning 35mm Images

    0
    Terra Clean Energy

    Terra Clean Energy

    July 1, 2025
    Terra Clean Energy: Advancing an Expansive Uranium Landholding in the Prolific Athabasca Basin

    Terra Clean Energy: Advancing an Expansive Uranium Landholding in the Prolific Athabasca Basin

    July 1, 2025
    Zijin Mining to Acquire Major Kazakh Gold Mine for US$1.2 Billion

    Zijin Mining to Acquire Major Kazakh Gold Mine for US$1.2 Billion

    July 1, 2025
    Equity Metals

    Equity Metals

    July 1, 2025

    Recent News

    Terra Clean Energy

    Terra Clean Energy

    July 1, 2025
    Terra Clean Energy: Advancing an Expansive Uranium Landholding in the Prolific Athabasca Basin

    Terra Clean Energy: Advancing an Expansive Uranium Landholding in the Prolific Athabasca Basin

    July 1, 2025
    Zijin Mining to Acquire Major Kazakh Gold Mine for US$1.2 Billion

    Zijin Mining to Acquire Major Kazakh Gold Mine for US$1.2 Billion

    July 1, 2025
    Equity Metals

    Equity Metals

    July 1, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 freshnewstrademarket.com

    No Result
    View All Result

    Copyright © 2024 freshnewstrademarket.com