Fresh News Trade Market
Advertisement
  • Politics
  • Business
  • Stocks
  • Investing
No Result
View All Result
  • Politics
  • Business
  • Stocks
  • Investing
No Result
View All Result
Fresh News Trade Market
No Result
View All Result
Home Investing

Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

admin by admin
June 2, 2025
in Investing
0
Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Ioneer Ltd (ASX: INR, Nasdaq: IONR) (Ioneer) is pleased to announce a 308% upgrade to the Ore Reserve estimate for its 100%-owned Rhyolite Ridge Lithium-Boron Project (‘Rhyolite Ridge’ or the ‘Project’) in Nevada, USA, alongside updated Project economics.

  • Rhyolite Ridge Ore Reserve more than quadrupled from 60 million tonnes in 2020 to 247 million tonnes, delivering a mine life of 95 years
  • Ore Reserve now contains a total of 1.92 Mt of lithium carbonate equivalent and 7.68 Mt of boric acid equivalent
  • Underpinning plans for a large, long-life, low-cost expandable operation, producing lithium carbonate, boric acid and then battery-grade lithium hydroxide
  • Stable co-product – boric acid accounts for an average 25% of annual revenue in the first 25 years; helping ensure positive EBITDA at low lithium prices and EBITDA margin of 65.7% based on average production over first 25 years
  • All-in sustaining cash cost of US$5,745 per metric tonne lithium carbonate equivalent places the Rhyolite Ridge Project in the bottom of the global lithium cost curve
  • Compelling Project economics with an after-tax NPV of US$1.367 billion, and an unlevered, after-tax internal rate of return (IRR) of 14.5%

The Ore Reserve has increased by 186.6 million tonnes (Mt) and approximately 48% of the Mineral Resource has been converted into Reserve, now estimated at:

  • 246.6 Mt at 1,464 ppm lithium and 5,444 ppm boron
  • Containing 1.92 Mt of Lithium Carbonate Equivalent (LCE) and 7.68 Mt of Boric Acid Equivalent (BAE)

“Today’s updated Reserve and Mine Plan reinforces the importance of Rhyolite Ridge’s remarkable mineralogy. Our Ore Reserve estimate of 247 Mt containing a total of 1.92 Mt LCE and 7.68 Mt BAE make it the largest lithium-boron Reserve in the world,” said Bernard Rowe, Managing Director, Ioneer. “It allows Ioneer to match prevailing market conditions and blend or prioritise ore to produce a valuable boric acid co- product, whose market is uncorrelated with the Project’s primary lithium product. No other lithium project offers this level of flexibility and economic advantage. In periods of low cycle lithium pricing, like today, we plan to prioritize the high-boron ore production to optimize the relative proportion of total revenue derived from boric acid.”

By prioritising High-Boron (Hi-B) ore in the first 25 years of production, the Project is poised to produce an average of ~19,200 tonnes per annum (tpa) of LCE, and 116,400 tpa of boric acid (see Table 1).

The updated Ore Reserve estimate, 95-year mine plan for stage one operations, and Project economics reaffirms Rhyolite Ridge as a highly attractive global Project to produce lithium carbonate, lithium hydroxide and boric acid. The updated findings position Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,745 and a cash cost of C1 $3,858 per tonne net of expected boric acid revenue in the first 25 years.

The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid credit. Boron remains one of the most stable natural resource commodities over many decades.

Ioneer has refined Project plans over the past four years and updates now include an Association for the Advancement of Cost Engineering (AACE) Class 2 capital cost estimate (-10%, +15%) with approximately 70% of the Project’s engineering complete. As a result of this and other engineering work including RAM analysis and detailed engineering design, Ioneer has adopted a more conservative approach to plant availability, equipment downtime and maintenance strategies. While this approach reduces bottom line economics, the Company believes it is appropriate for a Project of this type and scale.

The Company now estimates total capital expenditure to complete the Project will be US$1,667.9 million, including a 10% contingency.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

Harmony Gold to Acquire MAC Copper in US$1.03 Billion Deal

Next Post

Cardiex Receives TGA Approval for CONNEQT Pulse Device

admin

admin

Next Post
Cardiex Receives TGA Approval for CONNEQT Pulse Device

Cardiex Receives TGA Approval for CONNEQT Pulse Device

    Become a VIP member by signing up for our newsletter. Enjoy exclusive content, early access to sales, and special offers just for you! As a VIP, you'll receive personalized updates, loyalty rewards, and invitations to private events. Elevate your experience and join our exclusive community today!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    • Trending
    • Comments
    • Latest

    DP Trading Room: Spotlight on Mega-Cap Earnings

    July 29, 2024

    The Last Guardian Playstation 4 Game review

    June 26, 2024
    Missed the Gilead Surge? Here’s What You Need to Know About the Big Move

    Missed the Gilead Surge? Here’s What You Need to Know About the Big Move

    July 30, 2024

    Explore Morocco’s Desert and Seaside With These Stunning 35mm Images

    May 31, 2024
    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    0

    Yamaha 2017 MotoGP bike launched with Rossi and Vinales

    0

    Sony shares a list of 39 titles that will be optimized for the PS4 Pro at launch

    0

    Explore Morocco’s Desert and Seaside With These Stunning 35mm Images

    0
    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    June 3, 2025
    SOURCE ROCK ROYALTIES ANNOUNCES FIRST QUARTER 2025 RESULTS

    SOURCE ROCK ROYALTIES ANNOUNCES FIRST QUARTER 2025 RESULTS

    June 3, 2025
    Empire Metals Limited Announces Major Drilling Campaign Targeting Maiden MRE

    Empire Metals Limited Announces Major Drilling Campaign Targeting Maiden MRE

    June 3, 2025
    Edward Sterck: Platinum Price on the Move, Perfect Storm Coming?

    Edward Sterck: Platinum Price on the Move, Perfect Storm Coming?

    June 3, 2025

    Recent News

    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    Allied Critical Metals Commences 5,000 Metre Drill Program at its Borralha Tungsten Project

    June 3, 2025
    SOURCE ROCK ROYALTIES ANNOUNCES FIRST QUARTER 2025 RESULTS

    SOURCE ROCK ROYALTIES ANNOUNCES FIRST QUARTER 2025 RESULTS

    June 3, 2025
    Empire Metals Limited Announces Major Drilling Campaign Targeting Maiden MRE

    Empire Metals Limited Announces Major Drilling Campaign Targeting Maiden MRE

    June 3, 2025
    Edward Sterck: Platinum Price on the Move, Perfect Storm Coming?

    Edward Sterck: Platinum Price on the Move, Perfect Storm Coming?

    June 3, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 freshnewstrademarket.com

    No Result
    View All Result

    Copyright © 2024 freshnewstrademarket.com